Pressroom

Welcome to the Press Centre of ATP architects engineers. Here you can find and download current press information and other basic information about our company.

0 files in the lightbox
12.10.2020 Integrated Design, BIM, ATP Vienna, Lifecycle

RINGANA campus, St. Johann in der Haide, AT

ATP designs for an Austrian manufacturer of natural cosmetics

The natural cosmetics and life sciences company RINGANA is on track for success and expansion. Hence, ATP Vienna was commissioned with the integrated design of a major production building, in which three previous facilities are being brought together.

17.07.2020 Integrated Design, Lifecycle

Real Estate Brains

ATP CEO Christoph M. Achammer in the online forum on the subject of “How will we build in the future?”

Real Estate Brains – this is the name of the online format of Swiss Circle, SwissPopTech, and Builtworld. Every two weeks, the forum brings together the “sector’s brightest brains” in the virtual realm. And this has been very well received: The 10th edition, which addressed the subject “Innovation on the building site – how will we build in the future?

08.05.2020 Lifecycle

An Opportunity for Climate Protection

ATP sustain shows how the economic restart could succeed in the interests of sustainability

40 % of Europe’s greenhouse gas emissions can be traced back to buildings. There is huge room for improvement in this area. The fact that an ecological approach and local purchasing decisions also make economic sense for building projects was known long before building materials became stuck overseas waiting for delivery due to corona.

20.02.2020 Awards, Integrated Design, ATP Innsbruck, Lifecycle

Double Gold!

Highest ÖGNB and klimaaktiv scores for the Technology Center Seestadt

Prizes are raining down on tz2: This year, Austria’s most sustainable  buildings have once again been honored for their exceptional performance in the areas of ecology and energy efficiency as part of the Vienna Congress for Sustainable Building (BauZ!) and the “klimaaktiv construction and refurbishment” program. Thanks to its very high scores, Phase 2 of Technology Center Seestadt even claimed a “double gold.”

...

...